upgrade/6-1/phase1

Upgrade overview >

Phase 1

Proposal from discussion between Frans and Kester (26th Mar).

Aim: Migrate all the data to working D6 nodes and their fields.

The interaction design, themeing will change a bulk of other things that may or may not need to be upgraded. Possibly the relationships between nodes in projects, certainly the views etc. The data will however need to be in working nodes and fields, even if more is added in the process. This will give a basic Drupal 6 install with all present data intact, and somewhere (possibly for the designer) to direct the next phase for the next most useful things to have working for people.

Known issues: